Geyser Installation - The Facts

Some Ideas on Geyser Installation You Need To Know


In this article I will certainly describe the common standard requirements of a sound, modern-day high pressure, straight installment. If you require detail, after that I recommend that you look at the site (). For anyone looking for, contact your local plumbing organisation. The complying with description associates with a modern high stress (400/600Kpa) system typically made by Kwikot South Africa.


geyser installationgeyser installation


Less typical are old reduced pressure systems (100kpa) open pipeline or "Latco" kind systems. Understand that the parts are NOT interchangeable in between the two unique systems - High stress and Low stress! It is possible to remove an old reduced pressure system and also replace it with a modern-day high pressure system nonetheless - you purchase a brand-new high pressure geyser and also mount it according to the present requirements.




The very same rules apply yet there are some unique factors to consider outlined at the end - with a representation. photo kwikot - One of the most noticeable thing that you ought to discover today. The hot spring beings in a tray constructed from plastic (usually red) or tin plate. I favor the plastic ones.


Given that June 2001, the drip tray is not optional - its reached be there and also there needs to be a drain pipeline for it! The drainpipe is a 50mm PVC waste pipe that drains the tray by piping the water out your house. I have seen lots of drip trays set up without drains! If your installation pre-dates June 2001 you might wish to obtain a plumbing technician to consider it.


The Ultimate Guide To Geyser Installation


The two vacuum cleaner breakers stand vertically regarding 30cm above the geyser. These are essential, as they quit water siphoning out the hot spring when the chilly supply is stopped - geyser installation.


Keep in mind that vacuum cleaner breakers are a fairly new need - there are still thousands of old HP systems out there without vacuum breakers and I am yet to see one collapse. Just since I haven't seen it doesn't mean it's not happening!


The cool water side is the side that straight connects to the drainpipe dick as well as goes into the geyser at the base. After the shut down valve you would generally find a Pressure Control Valve (PCV). There are a variety of different kinds, mainly constructed from brass but some are constructed from plastic.


This is where the PCV launches pressure and this is the pipeline that usually trickles. Don't stress if you can not discover the PCV alongside the hot spring - it might be placed up to 10 metres away, usually in an extra accessible position on a wall surface exterior. Occasionally it remains in a little plastic box outside.


How Geyser Installation can Save You Time, Stress, and Money.


This is a vital element that must never ever be messed with or 'repaired'. This valve needs to have a steel (copper or steel) pipeline attached to it and the pipe need to lead straight out the building. This vent pipe is an essential safety and security feature of the entire system. It needs to be made of copper or steel - plastic.


The T&P valve is the least optional component - it needs click here to find out more to exist! - The weight of the hot spring need to be sufficiently sustained on the roofing trusses - a minimum of two assistances under the 'feet' of the geyser. If it looks unsteady get a plumbing technician to inspect it out.


The hot spring has to be earthed! I have seen lots of hot springs with the earth cord unconnected. All the copper pipes have to also be earthed as well as bonded to the hot spring earth.




Again, these are frequently simply left existing next to the geyser. There are basically only two main thermostat types - the modern-day round "Kwiktherm" in newer Kwikot geysers and the VK (rectangle-shaped block) enter older geysers as well as in some newer non-Kwikot systems. The geyser may be fed (chilly water) with polcop (plastic) pipeline - as much as the shut off shutoff, however the pipe into and also out of the geyser need to be copper or galvanized steel.


Some Known Details About Geyser Installation


geyser installationgeyser installation


The hot water side should be copper, steel or accordingly rated (70) plastic or composite pipeline. Note that you must contend the very least 1m of copper/steel pipe out the geyser - you may not link plastic (composite) pipeline straight to the hot spring. As above, the PCV as well as T&P must be made from copper or steel - especially the vent out of the T&P this page shutoff.


geyser installationgeyser installation


I have Full Article seen a variety of installments where the installer has merely run a brief size of 22mm copper into the drip tray with the idea being that the T&P can air vent straight right into the drip tray. An idea since the hot (100 +) water/steam melts the drip tray and also the PVC drain pipe.


The PCV is usually above the hot spring and the chilly water moves down right into the geyser. This is quite crucial since it creates an anti-syphon loop that stops the hot spring from draining pipes back through the inlet in the occasion of a supply of water failing. If you fume water appearing your chilly faucets when the water stops working then this is not functioning properly.

Leave a Reply

Your email address will not be published. Required fields are marked *